[email protected] +8619138100129 Mon - Sat 08:30 - 18:00 (GMT+8)
Company

Construction Indonesia 2019

Dear Customer, Hamac is attending the coming Construction Indonesia 2019(The 21st International Series of Building, Construction and Infastructure.

Construction Indonesia 2019

Construction Indonesia 2019

Dear Customer, Hamac is attending the coming Construction Indonesia 2019(The 21st International Series of Building, Construction and Infastructure Development exhibitions)from 18th to 21st, September, 2019, which cover Mining machinery, Concrete Machinery,Building materials, Construction technologies, construction tools building materials, mechanical electrical engineering systems, Hardware, tools, machinery, building materials, technology, design, infrastructure and much more,concrete etc, we are looking forward to have a face to face communication opportunity with you, and building new business connection with you. Construction Indonesia, now in its 21st edition is Indonesias largest and most popular construction exhibition. With huge investments ongoing in the region Construction Indonesia provides the perfect platform for industry professionals and key players from the global construction industry to network and showcase their latest products and services. Organised by PT. Pame

Choosing a Construction Indonesia 2019 is rarely decided by the price tag alone. Downtime, concrete quality consistency, fuel consumption per cubic metre and the availability of wear parts across a five-year operating window matter far more to the final cost per tonne or per cubic metre produced.

Related Equipment Capability

Fast erection and stripping

Lightweight design and simple adjustment nuts reduce labour hours per square metre.

Certified load ratings

Every size carries a declared safe working load verified by proof testing, not estimation.

Interchangeable components

Standardised tube diameter and thread pitch simplify stock management across sites.

ParameterSpecification
ProductAdjustable steel prop / Acrow prop / heavy-duty shoring prop / scaffolding system
Height range1.6 - 5.0 m depending on model
Safe working load10 - 40 kN depending on model and extension
Tube diameter40/48 mm, 48/56 mm, 60/76 mm
Wall thickness1.6 - 3.5 mm

From Enquiry to Commissioning

Six defined stages, each with named deliverables, so nothing is left to interpretation.

Requirement study

We start with your mix design, hourly output target, aggregate size, jobsite power supply and site layout — not with a catalogue page.

Scheme design

Our engineering team issues a layout drawing, foundation loads, power requirement and an equipment list matched to the target output.

Quotation & contract

A fixed specification quotation with clear technical annexes protects both sides; no vague "standard configuration" wording.

Production & inspection

Weekly production photos, welding and pressure test records, plus third-party inspection if your project requires it.

Delivery & installation

Container or break-bulk shipment, then on-site supervision of assembly, alignment, calibration and dry-run.

After-sales

Remote diagnostics by video call, spare parts dispatch within 48 hours for stocked items, and periodic return visits.

Frequently Asked Questions about Construction Indonesia 2019

How many props do I need for my slab?
Provide slab area, thickness and pour height and we will calculate prop spacing — typical spacing is 1.0-1.2 m in each direction.
Are props tested?
Every production batch is proof-loaded to 1.5x safe working load, and test records are available on request.
Do you supply used props?
No — we only ship new, tested material so the load rating can be certified.
What is the minimum order quantity?
Usually one 20GP container, mixed sizes permitted.
Galvanised or painted?
Galvanised costs more upfront but usually wins where equipment is repeatedly exposed to rain or marine air.

Related Equipment & Resources

Request pricing

Get a Matched Proposal for Construction Indonesia 2019

Tell us the required output, material characteristics, site power supply and destination port. Our engineers return a complete technical and commercial proposal, normally within one working day.

  • Layout drawing and foundation loads supplied before order
  • Fixed specification quotation with a technical annex
  • Spare parts recommendation and operating cost estimate

Email: [email protected]
WhatsApp: +8619138100129

Quick Enquiry

We reply within one working day. Your details stay confidential and are never shared.

Talk to an engineer

Discuss Your Construction Indonesia 2019 Requirement

Twenty years of export experience across eighty countries. One engineer follows your project from enquiry to commissioning.

Chat on WhatsApp

Fast reply from our sales engineers, Mon - Sat.

+8619138100129

Ask for a quotation, spec sheet or factory video.

Start WhatsApp Chat
Send us an Email

Spec drawings, quotations and project proposals.

We answer technical enquiries within one working day.

Write an Email