Concrete Plant Layout

Concrete Production and Transportation

For different projects which need the concrete pouring, different equipments will be used to meet these different needs. HAMAC provide you with different.

Concrete Production and Transportation
Concrete Plant Layout

Concrete Production and Transportation

For different projects which need the concrete pouring, different equipments will be used to meet these different needs. HAMAC provide you with different types of concrete batching plants for your different projects.

What Defines a Good Concrete Pumps & Placing Booms

Selection depends on three numbers — peak m³/h required, horizontal distance, and vertical height — plus an honest look at the mix: aggregate shape, fines content and slump determine whether a given pipeline length is achievable at all.

Concrete has to arrive at the formwork continuously and without segregation. That is the entire purpose of this product family: Concrete Production and Transportation equipment takes plastic concrete from a truck or mixer and delivers it horizontally along a pipeline or vertically through a placed boom, at a rate the finishing crew can absorb.

Safety built into the controls

Outrigger interlocks, boom angle limits and emergency stop circuits protect both crew and structure.

Wash-out systems included

Integrated water tank, high-pressure pump and cleaning accessories reduce end-of-shift time.

Boom reach without a crane

Independent placing puts concrete precisely where the crew is working without occupying lifting capacity.

Buying Questions Answered

Do I need a special mix design for pumping?
Yes, a pumpable mix: continuous grading, sufficient fines (roughly 350-400 kg/m³ below 0.25 mm), and no gap-graded coarse aggregate.
Can the machine handle low-slump concrete?
Most units are optimised for 120-200 mm slump; below that, pressure requirements rise sharply and output falls.
How tall can it pump?
Vertical reaches of 100-150 m are routine with correctly designed pipelines and adequate concrete pressure.
How do I prevent pipeline blockages?
Keep slump at 120-180 mm, maintain adequate fines, prime the line with mortar before each pour and avoid long idle periods.
Talk to an engineer

Need Help Narrowing Down the Choice?

Send your output requirement and site conditions; we will shortlist the configurations that actually fit.

Chat on WhatsApp

Fast reply from our sales engineers, Mon - Sat.

+8619138100129

Ask for a quotation, spec sheet or factory video.

Start WhatsApp Chat
Send us an Email

Spec drawings, quotations and project proposals.

We answer technical enquiries within one working day.

Write an Email