[email protected] +8619138100129 Mon - Sat 08:30 - 18:00 (GMT+8)
Company

Mining Indonesia 2019

Dear Customer, Hamac is attending the coming Mining Indonesia 2019 from 18th to 21st, September, 2019, which cover Mining machinery, Extraction machines.

Mining Indonesia 2019

Mining Indonesia 2019

Dear Customer, Hamac is attending the coming Mining Indonesia 2019 from 18th to 21st, September, 2019, which cover Mining machinery, Extraction machines, material handling, mineral processing among many more,Building materials, Construction technologies, construction tools building materials, mechanical electrical engineering systems, concrete etc, we are looking forward to have a face to face communication opportunity with you, and building new business connection with you. Mining Indonesia is Asias largest international mining equipment exhibition and provides a professional platform for Indonesias mining industry to do business. Now in its 19th edition Mining Indonesia is well known and respected amongst industry professionals. The show attracts industry leaders and key players in the global mining industry; to showcase the latest products and services in one venue, the Jakarta International Expo. Please find the details and our both position as follow, see you there! Exhibition:

Most enquiries we receive start after a fleet problem — a pump that loses pressure on long booms, a mixer whose drum liners wear prematurely, a batching plant whose weighing tolerance drifts. Each of those has an engineering answer, and that answer belongs in the design stage rather than in the warranty claim.

From Enquiry to Commissioning

Six defined stages, each with named deliverables, so nothing is left to interpretation.

Requirement study

We start with your mix design, hourly output target, aggregate size, jobsite power supply and site layout — not with a catalogue page.

Scheme design

Our engineering team issues a layout drawing, foundation loads, power requirement and an equipment list matched to the target output.

Quotation & contract

A fixed specification quotation with clear technical annexes protects both sides; no vague "standard configuration" wording.

Production & inspection

Weekly production photos, welding and pressure test records, plus third-party inspection if your project requires it.

Delivery & installation

Container or break-bulk shipment, then on-site supervision of assembly, alignment, calibration and dry-run.

After-sales

Remote diagnostics by video call, spare parts dispatch within 48 hours for stocked items, and periodic return visits.

Related Equipment & Resources

Request pricing

Get a Matched Proposal for Mining Indonesia 2019

Tell us the required output, material characteristics, site power supply and destination port. Our engineers return a complete technical and commercial proposal, normally within one working day.

  • Layout drawing and foundation loads supplied before order
  • Fixed specification quotation with a technical annex
  • Spare parts recommendation and operating cost estimate

Email: [email protected]
WhatsApp: +8619138100129

Quick Enquiry

We reply within one working day. Your details stay confidential and are never shared.

Talk to an engineer

Discuss Your Mining Indonesia 2019 Requirement

Twenty years of export experience across eighty countries. One engineer follows your project from enquiry to commissioning.

Chat on WhatsApp

Fast reply from our sales engineers, Mon - Sat.

+8619138100129

Ask for a quotation, spec sheet or factory video.

Start WhatsApp Chat
Send us an Email

Spec drawings, quotations and project proposals.

We answer technical enquiries within one working day.

Write an Email