[email protected] +8619138100129 Mon - Sat 08:30 - 18:00 (GMT+8)
Concrete Pumps & Placing Booms

Concrete Pumping Plant - Page Two

One-stop solution provider for concrete pumping. With more than 20 years abundant experience on concrete pumping, HAMAC provide you with various types of.

Concrete Pumping Plant - Page Two
Concrete Pumps & Placing Booms

Concrete Pumping Plant - Page Two

One-stop solution provider for concrete pumping. With more than 20 years abundant experience on concrete pumping, HAMAC provide you with various types of concrete pumps such as trailer concrete pump, concrete line pump, concrete boom pump and the concrete placing boom. Your efficiency will be highly improved under our professional service on concrete pumping solutions.

Showing 25–31 of 31 entries

What Defines a Good Concrete Pumps & Placing Booms

HAMAC supplies truck-mounted boom pumps for high-rise and large slabs, static and trailer line pumps for tunnels and long horizontal runs, spider placing booms for wide industrial floors, self-climbing booms that travel with the core of a tower, and separate placing masts for precast yards.

Concrete has to arrive at the formwork continuously and without segregation. That is the entire purpose of this product family: Concrete Pumping Plant - Page Two equipment takes plastic concrete from a truck or mixer and delivers it horizontally along a pipeline or vertically through a placed boom, at a rate the finishing crew can absorb.

Safety built into the controls

Outrigger interlocks, boom angle limits and emergency stop circuits protect both crew and structure.

S-tube valve reliability

Hardened wear plates and cutting rings provide extended service intervals under abrasive mixes.

Continuous placement

Steady flow keeps cold joints out of slabs and eliminates the double-handling cost of crane-and-skip methods.

Buying Questions Answered

What is the expected service life of wear parts?
Delivery cylinders 40,000-80,000 m³, cutting ring and wear plate 15,000-30,000 m³ depending on aggregate abrasiveness.
Do I need a special mix design for pumping?
Yes, a pumpable mix: continuous grading, sufficient fines (roughly 350-400 kg/m³ below 0.25 mm), and no gap-graded coarse aggregate.
How do I prevent pipeline blockages?
Keep slump at 120-180 mm, maintain adequate fines, prime the line with mortar before each pour and avoid long idle periods.
How tall can it pump?
Vertical reaches of 100-150 m are routine with correctly designed pipelines and adequate concrete pressure.
Talk to an engineer

Need Help Narrowing Down the Choice?

Send your output requirement and site conditions; we will shortlist the configurations that actually fit.

Chat on WhatsApp

Fast reply from our sales engineers, Mon - Sat.

+8619138100129

Ask for a quotation, spec sheet or factory video.

Start WhatsApp Chat
Send us an Email

Spec drawings, quotations and project proposals.

We answer technical enquiries within one working day.

Write an Email